Load Bank Testing for UPS and Generator
We provide UPS and Generator checks both scheduled and upon request.
A Load Bank test will give prompt identification of any issues with your UPS and Generator and the remedial actions necessary.
Should you rely on your Generator as part of a Critical Power System, then a periodic load bank test is essential to ensure that it runs efficiently.
Battery Testing
Carried out annually from the time they were installed from new, will provide a health history of the individual battery in the string. If an individual battery shows signs of failure, then the unit can be changes avoiding the replacement of the entire string.
A Load Bank Testing will ensure that all the components within the system will work and perform properly when called upon to support a critical load and represents. We recommend our Clients to periodically test the power systems as this maximizes the lifetime of the system and monitors and protects the system, leading to a much lower replacement cost.
